metboss
Petroleum
- Sep 12, 2012
- 152
Hi,
We have placed the order for Wellhead equipment with API monogram (API 6A, 20th edition) in Oct 2019. Now, OEM has come up with clarification that equipment’s manufactured after Nov. 2019 will not be monogrammed as new API 6A 21st edition is in place. They are saying that there is a difference in raw material qualification (QTC) w.r.t. 20th edition and if we still need the monogram, then, it will have a cost impact.
Can you please tell me what the difference between two editions is? How will it effect on cost? What is QTC and ER as defined in API 6A?
We have placed the order for Wellhead equipment with API monogram (API 6A, 20th edition) in Oct 2019. Now, OEM has come up with clarification that equipment’s manufactured after Nov. 2019 will not be monogrammed as new API 6A 21st edition is in place. They are saying that there is a difference in raw material qualification (QTC) w.r.t. 20th edition and if we still need the monogram, then, it will have a cost impact.
Can you please tell me what the difference between two editions is? How will it effect on cost? What is QTC and ER as defined in API 6A?