Hi Folks,
I am evaluating an opportunity for a co-generation project at an industrial site. This site uses, during peak times 30,000 lbs per hour of steam at 250 psi saturated and has process use for 10,000 lbs hour of lower pressure 50 lbs per hour. During half of the year steram flow is about 50%Steam is currently produced by #6 fuel oil.
This plant can use all of the electrical power, typically at 600 volts,that can be produced by a co-gen project. Bio waste and saw mill hog fuel is available for a potential new wood fired boiler.
Looking at new boiler, turbine, generator and possible steam condensing equipment.
Does anyone have experience with this type or size of project in terms of approximate costs, potetial payback, project challanges or similar opportunities?
Regards,
Mike
I am evaluating an opportunity for a co-generation project at an industrial site. This site uses, during peak times 30,000 lbs per hour of steam at 250 psi saturated and has process use for 10,000 lbs hour of lower pressure 50 lbs per hour. During half of the year steram flow is about 50%Steam is currently produced by #6 fuel oil.
This plant can use all of the electrical power, typically at 600 volts,that can be produced by a co-gen project. Bio waste and saw mill hog fuel is available for a potential new wood fired boiler.
Looking at new boiler, turbine, generator and possible steam condensing equipment.
Does anyone have experience with this type or size of project in terms of approximate costs, potetial payback, project challanges or similar opportunities?
Regards,
Mike