apowerengr
Electrical
- Jul 19, 2006
- 208
Any thoughts on what standards you'd apply in performing an arc flash hazard analysis in a utility-owned power plant in the US? NESC rule 410 appears to be applicable to lines and the NEC does not apply to utility owned power plants so I'm not clear if NFPA 70E applies? Thanks in advance for the feedback!