Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations IDS on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Are calculations to latest version of the ASME BPVC code required for replacement PVs?

Status
Not open for further replies.

timsch

Mechanical
Oct 27, 2009
181
Our company manufactures multipoint thermocouple assemblies that are designed to the current ASME BPVC SEC.VIII, DIV.1. Frequently we get orders for replacement assemblies, with no changes, and I get requests for updated calculations based on the latest release of the BPVC. I thought I read somewhere in VIII, DIV.1, that a design could be accepted based on proven service of the same design with no additional calculations required. I looked through the 2015 version, and could not find any such justification.

Perhaps I am just thinking of wording from other section of the code, such as piping. Are calculations to the latest version required for these instances?
 
Replies continue below

Recommended for you

My understanding is that you base your calculations to the original codes to which the pressure vessels were constructed. Now if the original codes were changed over the years and you are asked to base your calculations on newer codes, as long as you can prove equivalency or better I do not believe that it would be an issue. Better yet ask the local jurisdictions.
 
See ASME Section VIII Div.1, Appendix 43.
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor