JoMoEIT
Structural
- Aug 25, 2011
- 8
I'm currently working on a project that consists of a PEMB as MFRS with our firm designing a brick and metal stud curtainwall system 17.33' tall. These studs are bypassing the PEMB system, being connected to a wind beam @ EL 15.17'. My question is in regards to both the design of the stud as well as the design of the connection. I'm contending that for design of the stud; parapet C&C pressure along with wall C&C pressure should be based on an effective area of the entire stud (17.33*17.33/3=100ft2) instead of the individual areas for individual pressures. This makes a significant difference in the deflection calculation and our office is in disagreement as to which way to move forward with this. Does anyone have any literature or insight addressing this situation?
Thanks for the help,
Brett
Thanks for the help,
Brett