SuPeR9981
Mechanical
- Jul 19, 2018
- 6
Hi All,
In API 1104, we need to record down all the time lapse between passes from root, hot , fill until cap. However for ASME IX does not mention about that.
Now my problem is if I finish the welding of root, hot and one layer of fill passes then I stop welding and let the weld bead completely cooled, after 3 days I just continue welding again until cap. Is that any problems in term of mechanical properties of materials and also the the defect that I gonna face since I let the weld cool down after complete the hot pass?
Besides , is API 1104 and ASME IX allow us to do that? If not what is the theory behind this?
Thank you
In API 1104, we need to record down all the time lapse between passes from root, hot , fill until cap. However for ASME IX does not mention about that.
Now my problem is if I finish the welding of root, hot and one layer of fill passes then I stop welding and let the weld bead completely cooled, after 3 days I just continue welding again until cap. Is that any problems in term of mechanical properties of materials and also the the defect that I gonna face since I let the weld cool down after complete the hot pass?
Besides , is API 1104 and ASME IX allow us to do that? If not what is the theory behind this?
Thank you