Good afternoon.
Reference: ASME Section IX and API 650
Welding Process: SMAW
My client required the PQR to be qualified with a minimum of 3 PWHT cycles.
The material to be welded is 25 mm thick and the PWHT holding is 1 hour.
So I PWHT the PQR coupon for 6 hours in one heat. That is, heating it up to the holding temperature, hold for 6 hours before cooling down.
But my client rejected the PQR saying that it was not 3 cycles because they expected to see 3 separate heating, holding and cooling.
Is there any interpretation on QW-407 that say the number of times for heating and cooling is not necessary.
Thanks.
Reference: ASME Section IX and API 650
Welding Process: SMAW
My client required the PQR to be qualified with a minimum of 3 PWHT cycles.
The material to be welded is 25 mm thick and the PWHT holding is 1 hour.
So I PWHT the PQR coupon for 6 hours in one heat. That is, heating it up to the holding temperature, hold for 6 hours before cooling down.
But my client rejected the PQR saying that it was not 3 cycles because they expected to see 3 separate heating, holding and cooling.
Is there any interpretation on QW-407 that say the number of times for heating and cooling is not necessary.
Thanks.