Diego N. Bruzzone
Mechanical
- Oct 19, 2016
- 2
Dear all:
My question is not related to the design of the equipment, it is related to the subsequent inspection, applying API 510. How are periodic inspections planned for equipment with 0 excess corrosion thickness? As I understand it, strictly applying the code, an FFS should be done as soon as the equipment reaches over corrosion thickness 0. On day 1 of entry into service.
This is really worrying in equipment where note 35 of the ASME VIII code has been applied, equating the MAWP with the design pressure. With the subsequent pressure reduction of the hydraulic test. There is no room left to make a rerate. This situation leads to doing an FFS, rerate and retest on day 1 of commissioning.
Thanks in advance
My question is not related to the design of the equipment, it is related to the subsequent inspection, applying API 510. How are periodic inspections planned for equipment with 0 excess corrosion thickness? As I understand it, strictly applying the code, an FFS should be done as soon as the equipment reaches over corrosion thickness 0. On day 1 of entry into service.
This is really worrying in equipment where note 35 of the ASME VIII code has been applied, equating the MAWP with the design pressure. With the subsequent pressure reduction of the hydraulic test. There is no room left to make a rerate. This situation leads to doing an FFS, rerate and retest on day 1 of commissioning.
Thanks in advance