Hello,

I am currently a field engineer and we are pouring foundations in which the the supplier is using 20% class f fly ash to mitigate ASR. THe back up plan is to use lithium nitrate. Currenly their mix will use 542 lbs cement and 141 lbs class f fly ash. In the case of the back up plan, do they use 542 lbs cement, 141 lbs class c fly ash and lithium nitrate? THe back up plant is unable to hold class f so that is the reason behind lithium nitrate. Our specs state that class f or lithium nitrate must be used to mitigate asr
 
Replies continue below

Recommended for you

Yes, the lithium nitrate can be used in conjunction with fly ash.

Your portland cement percentage is still a bit high to mitigate ASR. You might consider using ground granulated blast furnace slag cement (GGBFS). While you will get a retarded strength gain (as you will with fly ash also), it will help quite a bit with the ASR issue.
 