ERC123
Geotechnical
- Jun 22, 2012
- 3
When the modified proctor came out in 1958 did it require 3 layers or 5 layers when pounding soil into the mold. I know that it is currently 5 layers and has been that way at least since 1970 but I do not have a copy of the original method. I also know that the standard proctor, ASTM D698 is 3 layers.