leur2011
Electrical
- Jan 20, 2012
- 54
This question is mainly in regards to consequences. I have a 480VAC open transition Automatic Transfer Switch (ATS) to put in service soon; and I'm wondering what happens if we designate single ended 480V switchgear SG-002 fed from existing upstream generators as normal “N” (preferred) power source-1 of ATS and utility fed double ended 480V switchgear SG-001 designated as emergency “E” (alternate) power source-2 of ATS as illustrated in the below diagram?
I understand that governing standards and codes stated that emergency DG set has to be standby (alternate power); not normal power (preferred). If we swap the two feeders does it impact the existing configuration of the electrical network system and maintenance of the emergency loop power supply system of the existing facility.
I understand that governing standards and codes stated that emergency DG set has to be standby (alternate power); not normal power (preferred). If we swap the two feeders does it impact the existing configuration of the electrical network system and maintenance of the emergency loop power supply system of the existing facility.