Automatic Shuttle Exchange-Abe Blank 2

Status
Not open for further replies.

lightl

Mechanical
Feb 8, 2016
42
0
0
IN
Is it possible to do automatic shuttle exchange after a program ends by using Dr Abe Blank..loading and unloading in nc generate anything there. After the head goes back g50 the shuttle exchange should occur. Is this possible
 
Replies continue below

Recommended for you

I don't know how to make the software do it but, G130 sends the machine home, M707 to change tables, M97 to repeat the same program.

It is possible to run a different program it's just tricky.
 
For safety reasons we never have it shuttle automatically but all you have to do is hit the start button again and it will shuttle. After the G130 at the top of the program put in /M707 make sure to use a block skip so it will not read the shuttle on the first sheet. When the sheet starts cutting turn the block skip off so when the sheet is done and the start button is pressed the beds will shuttle. Now every time the start button is pressed the beds will shuttle automatically.
 
Hello Lightl.


YOu have to go into preference
->NCGenerate
Look for : Pallet Exchange Timing Of Shuttle Table.
This should have number 2 after so it processes the code after the program.
Also Loading/Unloading device should be enabled.
And you need to check so that on Machine Set -> Loading/Unloading Device. This have to have the right Tandem Device Type.
If not it will give the wrong code to your machine.
(also the key LINE CONTROL needs to be turned on)


 