Allen.McGraw
Structural
- Nov 14, 2019
- 3
I'm hoping someone can help me arbitrate a debate between our engineering department and our production managers. Our engineering department wants to produce a "weld standards" drawing that defines weld requirements for the bulk of the configurations our shop personnel will encounter and only provide weld symbols when there is a deviation from the standard. Our production managers are insisting that all weld requirements be indicated on the individual shop drawings. The type of work we do is per-engineered metal buildings (PEMB) and some structural steel fabrication. Who's right in this situation? Any insight you can offer would be greatly appreciated.
Thank,
Allen
Thank,
Allen