In ASME B31.3
341.4.1
It states that:
"...at least 5% of fabrication. For welds, each welder’s
and welding operator’s work shall be represented."
For example, 1 welder have made 10 joints of for piping with the same size. Does this mean only half of the weld should be examined? Or it should be one whole weld (joint)?
341.4.1
It states that:
"...at least 5% of fabrication. For welds, each welder’s
and welding operator’s work shall be represented."