Considering B31.3 345.1 required leak test. Before initial operation a leak test is to be performed to insure tightness. Seemingly this leads me to believe a hydro should be performed in place as final install. However 345.2.3 tells me subassemblies can be tested separately or as assembled.
I am trying to determine if a hydro is technically supposed to be performed in place as installed with the exception of slip blinding or if a system can be temporarily bolted and hydro performed in a laydown yard leaving the final install tie in bolt up to be trusted.
I am trying to determine if a hydro is technically supposed to be performed in place as installed with the exception of slip blinding or if a system can be temporarily bolted and hydro performed in a laydown yard leaving the final install tie in bolt up to be trusted.