garnet1
Mechanical
- May 30, 2003
- 24
The xray requirements per 341.4.1 states 5% which will include a representation of each welders welds. I have always interpreted this to mean that 5% of each welders welds would be xrayed but have learned that this is not the case. All that is rquired is 5% of total welds and as long as each welder gets xrayed, the number is not important as long a a total of 5% gets shot. It also seems that welding process is a non issential here so a welder can use F6 on some welds and F3/4 on others and still be lumped in on the initial 5%. I would like some comments on this to see what others think. I usually go with a minimum of 5% per welder per process.