Hi all,
I could not find an answer in the B31.3 interpretations. Here is my problem. I am required to do several closure welds in various projects. The pipe spools being installed are pressure tested; however, the final connection will require a closure weld. The client also requires me to PWHT these line classes (Sour). I was under the impression that a closure weld was exempt from hydrostatic testing but the clients construction manager is telling me that if we PWHT the closure weld afterward then am I required to hydrotest the weld. So I ask, if I PWHT a closure weld am I required to hydrotest it after the PWHT is complete? For reference this job is being complete in Canada (BC).
Section 345.2.2 Other Test Requirements (B) states:
Heat Treatment. Leak tests shall be completed after any heat treatment.
Section 345.2.3 Special Provisions for Testing
(c) Closure Welds.
The final weld connecting piping
systems or components that have been successfully
tested in accordance with para. 345 need not be leak
tested provided the weld is examined in-process in
accordance with para. 344.7 and passes with 100% radio-
graphic examination in accordance with para. 344.5 or
100% ultrasonic examination in accordance with
para. 344.6
I could not find an answer in the B31.3 interpretations. Here is my problem. I am required to do several closure welds in various projects. The pipe spools being installed are pressure tested; however, the final connection will require a closure weld. The client also requires me to PWHT these line classes (Sour). I was under the impression that a closure weld was exempt from hydrostatic testing but the clients construction manager is telling me that if we PWHT the closure weld afterward then am I required to hydrotest the weld. So I ask, if I PWHT a closure weld am I required to hydrotest it after the PWHT is complete? For reference this job is being complete in Canada (BC).
Section 345.2.2 Other Test Requirements (B) states:
Heat Treatment. Leak tests shall be completed after any heat treatment.
Section 345.2.3 Special Provisions for Testing
(c) Closure Welds.
The final weld connecting piping
systems or components that have been successfully
tested in accordance with para. 345 need not be leak
tested provided the weld is examined in-process in
accordance with para. 344.7 and passes with 100% radio-
graphic examination in accordance with para. 344.5 or
100% ultrasonic examination in accordance with
para. 344.6