Hi.
we have a really flat 2 km long forced main. and the topography doesnt allow us to have a below grade gooseneck. is there a device that could add backpressure to the forced main to keep the pipe full at all times? the sewage water is going from the triturator pump stations towards a gravity section of the sewer.
we have a really flat 2 km long forced main. and the topography doesnt allow us to have a below grade gooseneck. is there a device that could add backpressure to the forced main to keep the pipe full at all times? the sewage water is going from the triturator pump stations towards a gravity section of the sewer.