kechha2060
Civil/Environmental
- Dec 8, 2007
- 26
I have a mile long road with ditch on both side. 4 x-culverts are proposed which are tend to act as a balancing resorvoir (max 60" pipe d/s). Will there be any problem since the culverts will be submerged for few days (3-4 days) before the water is finally let go through flap gates. culverts have head walls. will the roadway structural integirity be compromised? any other problem that might happen in the future??