RAMviking
Mechanical
- Oct 29, 2006
- 40
In the main assy (sheet one) I have ten parts. I have ten sheets containing the the individual parts. In the assy sheet I have the partlist and balloons
( item1 = Part1, item2 = part2 and so on).
All the sheets must have part list, but the pos. is allways "1", because it only contains one part.
I need to link all the sheets containing individual parts to the item list in the main assy.
( item1 = Part1, item2 = part2 and so on).
All the sheets must have part list, but the pos. is allways "1", because it only contains one part.
I need to link all the sheets containing individual parts to the item list in the main assy.