I was hoping for a help for this piping drawing. As you can see on the attached drawing, this is the Basement floor plan, they use 4" pipe under slab for soil and waste piping line.
My problem with the Civil Engr. is that excavation is underway and I don't know how much depth for the pipe should be needed.
from the floor drain,clean out, and toilet how much pipe depth should we need, and they mention about "INVERT LEVEL AND FALL HEIGHT" of the pipes. I was thinking of 12" pipe depth (as per code?) from the floor clean out until connected to the sewage pit which is 2m depth, but the civil engr. said the slab is 200mm thick and another 500mm for something (i forget what it is called).
Any help is much appreciated. Thanks in advance and I'm looking forward to learn from you guys, Thanks!
I was hoping for a help for this piping drawing. As you can see on the attached drawing, this is the Basement floor plan, they use 4" pipe under slab for soil and waste piping line.
My problem with the Civil Engr. is that excavation is underway and I don't know how much depth for the pipe should be needed.
from the floor drain,clean out, and toilet how much pipe depth should we need, and they mention about "INVERT LEVEL AND FALL HEIGHT" of the pipes. I was thinking of 12" pipe depth (as per code?) from the floor clean out until connected to the sewage pit which is 2m depth, but the civil engr. said the slab is 200mm thick and another 500mm for something (i forget what it is called).
Any help is much appreciated. Thanks in advance and I'm looking forward to learn from you guys, Thanks!