AJB1262
Civil/Environmental
- Jan 3, 2017
- 18
I have had several incidents where a previous designer has provided equalization pipes connecting basins together. For modeling purposes I have always ignored these pipes and used the combined volumes of the basins in my stage storage data. Is this a valid approach or is there another way this should be modeled in Hydrocad?