Got a beam schedule from some drawings, call out span, width, etc and then the Mmax and Vmax at service level. What is the point of that, when I need to know DL and LL?
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Lately I've been getting projects where the EOR has designed the entire building right down to the pile loads, but delegated the actual design of the piles. I could understand if the EOR wasn't local or the owner was refusing to get a geotechnical report or something, but in all cases the EOR has been local (so he knows the typical foundations used), there has already been a sealed geotechnical report with driven pile capacities. I can't imagine they saved a significant amount of design or detailing work by delegating the pile designs, but I guess I can't complain since it allows me to charge way more for a pile design than I would normally of included in the fee if I was the EOR for the same level of work.phamENG said:Wait a minute. Did somebody just delegate the design of the beams? Is that a thing now?
OP said:What is the point of that, when I need to know DL and LL?