Can anyone speak to the dangers of having a Dry type MV 13.2-480 transformer down for any amount of time and then bringing it up without testing? Should you dry them out like a motor? What is the best way to do it? What testing is adequate (Meggering)? What does good look like? What voltage is recommended? Is 1000VDC good enough? Should it be 500VDC or higher? What is the best practice for testing before re-energizing?