Hi,
Can we talk a little about how to handle huge assemblies in NX10/TC11 (we will upgrade to NX12 mid next year, so if you have advice that include NX 11 or 12 please post them too).

-How to handle, simplify, load, edit assemblies, place views in drawings etc.?
For example I can not find efficient way to use any of tools or techniques for simplifications. Each of NX simplification wizard solutions have unwanted issues (in way how we handle models in our work, not issues with tools itself), and simplification by arrangements can't be done as it load full assembly for each arrangement making models huge and hard to update, and simplification by reference sets does not give access to all levels of details for drawings.​

-How to use/divide assemblies so multiple NX users can work on same assembly.


_____________________________
Enjoy your work and have fun!
 
Replies continue below

Recommended for you

There are many ways to handle large assemblies. You can create Proximities to open certain parts of an assembly. You can create Lightweight Components etc.
Another way is to create JT files of the component or sub assy parts an open the JT versions for the areas of the Assembly you need to see in context but are not planning on working.

Josh
 
In NX12 there is a new way to handle the loading of Large Assemblies with Lightweight geometry.
They are now utilizing Multi threading with loading and you can start working on the assembly while it is loading.
A refile is mandatory however. Only works on parts which are saved in NX12.

Ronald van den Broek
Senior Application Engineer
Winterthur Gas & Diesel Ltd
NX9 / TC10.1.2

Building new PLM environment from Scratch using NX11 / TC11
 
@Joshua0977, "Another way is to create JT files of the component or sub assy parts an open the JT versions for the areas of the Assembly you need to see in context but are not planning on working."
We have setup that make JT automatically in TC, but I would like to hear how do you use JT in this context, maybe we can use this solution.

@NutAce, "A refile is mandatory however. Only works on parts which are saved in NX12." ouch! Well I still do not know if they will go for these kind of options that require refiling or not... I hope... But that is good to know!

_____________________________
Enjoy your work and have fun!
 
IvanNX said:
ouch! Well I still do not know if they will go for these kind of options that require refiling or not... I hope...

nothing wrong with refiling. It is even recommended when you skip multiple versions. Makes it a bit easier for the users when the data they are using is already in correct version.

Ronald van den Broek
Senior Application Engineer
Winterthur Gas & Diesel Ltd
NX9 / TC10.1.2

Building new PLM environment from Scratch using NX11 / TC11
 
Whoa!
1) As Ronald notes, a refile will be required for the "streaming loading" which will be implemented in 12.x ( not in 12.0)
2) Refile will be retired...
- I wonder if Siemens left hand is aware of what Siemens right hand does...


Regards,
Tomas
 
And I wonder what they mean whit this sentence from the release note?

In place of the refile utility, standalone utilities will be introduced that incorporate non-version-up related options and future NX batch processes.

/Mattias

NX5 -> NX12
I-deas 12, NX I-deas6.6
Solid Works 2017
 
Matnas said:
In place of the refile utility, standalone utilities will be introduced that incorporate non-version-up related options and future NX batch processes.

This most probably has something to do with the fact that NX12 is the last "numbered" version of NX. There won't be an NX13.
Siemens doesn't yet want do disclose how they are going to continue but I am guessing they are going to follow the same way as Microsoft Windows 10 releases.


Ronald van den Broek
Senior Application Engineer
Winterthur Gas & Diesel Ltd
NX9 / TC10.1.2

Building new PLM environment from Scratch using NX11 / TC11
 
I have been handling large assemblies with arrangement's but you need to set your load options to load structure only. Then when you open a file pick your arrangement first then open assembly. Doing it this way you can pick what files in the structure will open and you don't end up loading everything. Seems to work very well for us.
 
Docktega said:
I have been handling large assemblies with arrangement's but you need to set your load options to load structure only. Then when you open a file pick your arrangement first then open assembly. Doing it this way you can pick what files in the structure will open and you don't end up loading everything. Seems to work very well for us.

Bookmarks can be used to similar effect with the advantage that the load options don't need to be changed, NX will only load what is specified in the bookmark file.

www.nxjournaling.com
 