AlpineEngineer

Civil/Environmental
Aug 27, 2006
89
Like many of you I have a very small Civil Consulting company, myself and 1 employee. We are only 18mos old. We have a ton of small jobs, jobs under $500. Things like a perc test, quick little topo survey, size a beam here, ect. My dilema is we bill hourly which works out great until the job is ended. Then I am getting ph call after ph call from the architects, owners, county, ect.. asking questions. Then I send a bill for my phone time and the client freaks.

Should I just set a minimum job cost at say $500 to cover this incidental time? I had a $200 job that after the job was over I spent 2.5 hrs of phone and email time that they refused to pay because it wasn't in my verbal estimate!!! Hardly a profit there. Well sure it wasn't in my estimate, they asked for a price to do 'x' and I end up spending way more time dealing with the parties involved than just doing the calcs. Do any of you deal with this?
Thanks,
 
Replies continue below

Recommended for you

It is a problem.. I am in the mid-west - St. Louis

VERY simple jobs - I charge no less than $250. Simple jobs start at $500. $1000 for home design (no drawing) with new IBC/IRC Codes. If they think that is high - go somewhere else. I am usually overwhemlemd with these "little" jobs - because no else will do them.

I ALWAYS allow for an extra hour or two - keeps customer from "freaking" and they feel good that I didn't charge them extra. Some have even been appreciative!!

If it is REAL change - then I discuss the extra costs before proceding.

If perchance - they don't call back - I am ahead for the times they call back 10 times!!

Good Luck
 
We used to have this same issue and went to a minimum $500 fee. It cost us a few small jobs that probably would have been a pain anyway. But overall it has been no problem for our clients.

Always generate a written contract and get it signed.
 
Some use a four hour minimum on a signed contract for any job. This approach sends a lot of the real small jobs packing. Sounds like that may not be what you want here, so...

You can also have a contract, set fee, where you have worked in a reasonable amount of phonetime, listed in the contract, and state that anything above that will be billed at the hourly rate of XXXX.

Mike McCann
MMC Engineering
 
It is a tough situation. These customers will likely not come back whether you provide great service or not. If a homeowner contacts me, I ask them if they are working with a contractor and then I try to run through him - for the relationship and future work - since the contractor will understand my language better. I do not mind giving away some phone time if future work may come. Plus it adds to your karma account you need someday (glass half full) or may become a good deed that later punishes you (glass half empty).

In some cases, I have looked up public records on the clients (talking homeowners) and found one with a few civil cases (found out later he owned like 7 rental properties and they were evictions) and one where his mother owned the house so I drafted a contract for his mother to sign. Never did hear back from that guy.

Don Phillips
 
Same problem here. We went to a 3-hour minimum billing. That helped, but didn't cure the problem entirely.

MiketheEngineer, how do you get $1,000 for a house design with no drawings? What do you mean by that?
 
I don't bill by the hour, I always give the client a fixed price. I estimate a time, multiply by my hourly rate, and add 20-30% for "miscellaneous" (this is not listed in the proposal). If a client or his contractor calls, I have at least some compensation. As PatBethea mentioned this doesn't cure the problem completely, but then there are the jobs where nobody ever calls.
This approach also saves a lot of time and nerves as I don't have to keep track of time spent on the phone. After all, I make my living with engineering and not with bookkeeping.
Don't underestimate referrals, even if you think these clients won't come back. I get a lot of jobs where the guys got my phone no from friends or friends of friends.
If you have a reputation to charge for every call, you wil never get there. If you go with a lump sum, they will say that you stayed within the budget. Clients like that
(>>>>> good karma, as somebody mentioned above)
 
That is amazing, I know I work in a different field of engineering and in a different country but if we added 20-30% to a realistic quote we would never get any work.

To say I am jealous doesn’t begin to describe it; you must be living the life of Rielly.
 
ajack1,

we are talking about small jobs here(<$500.00), that is where I apply a 20-30% increase. If these clients look somewhere else, I don't mind. After all these mini jobs slow me down on the larger ones, that pay my bills. Reality is, I still get 8 jobs out of 10 proposals for these low budget jobs, so I still might quote too low.

Here is another story: Recently, on one of the larger jobs (in the $3,000.00 range)I didn't add anything to what I thought was realistic, and ended with an hourly rate of $4.00 (in words: four dollars per hour)due to my fixed price approach. Barely the life of Rielly. Still jaleous?
 
I've wondered about hourly rates, never having been in an hours-tracking position. I'm a "coast and burn" type person--I work *very* quickly, but with periods of uselessness in between. If I just counted the hours being hard at work, I'd probably take rather less time than the average bear. Would I bump up the hours to include some of the "coast" time as part of my normal work process?

Another way of asking it--do slow workers get to bill more hours (within reason)?

Hg

Eng-Tips policies: faq731-376
 
I use Quickbooks to track my time on projects and if I am not being productive on a project, I can look at what I am doing, and why, and adjust my proposals accordingly. An architect friend of mine told me after a couple of projects I was not charging enough. As I learned, I slowly raised my rates - nearly 100% since 2002. And I also factor an extra 15% to 25% depending on my perceived risk with that client.

Don Phillips
 