Hi,
On a design-build project, the DB has proposed using schedule 40 pvc pipe for the plumbing works. The MEP review consultant recommended schedule 80 pipe. As a compromise, the DB has offered to use schedule 40 black pipe (ductile iron?) with schedule 80 PVC bends which the reviewer has said is ok. This just does not seem right.
Any comments?
On a design-build project, the DB has proposed using schedule 40 pvc pipe for the plumbing works. The MEP review consultant recommended schedule 80 pipe. As a compromise, the DB has offered to use schedule 40 black pipe (ductile iron?) with schedule 80 PVC bends which the reviewer has said is ok. This just does not seem right.
Any comments?