Hi all
I came across this during an inspection. Contractor should have packed a 2x10 and then joists no idea why he did it this way. Without having to rip everything out how would you evaluate this situation structurally and are any other remediations possible ?
Thanks again
Lu
I came across this during an inspection. Contractor should have packed a 2x10 and then joists no idea why he did it this way. Without having to rip everything out how would you evaluate this situation structurally and are any other remediations possible ?