MIKE_311
Structural
- Feb 15, 2020
- 108
Working with a DOT on a current project, their prestressed beam details do not have flange ties in the bottom of the beam outside the anchorage zone (1.5h). Other surrounding DOTs I have worked with have a flange ties that are at a minimum placed with the web steel and tighter in the anchorage area.
My guess is that it may present a fabrication challenges with harped strands? If it's not really needed I can see leaving it out but I'd think you'd want some mild steel in the bottom flange for such a long area.
How common is this?
My guess is that it may present a fabrication challenges with harped strands? If it's not really needed I can see leaving it out but I'd think you'd want some mild steel in the bottom flange for such a long area.
How common is this?