Thedroid
Electrical
- May 18, 2008
- 196
Insurance company wants us to test all of our unit substation secondary breakers. They all GE AK breakers 600 and 1200A. They have all been retrofitted with AC Pro trip units within the last 10yrs.
Should we use primary or secondary injection for the tests. I don't think primary is a good option. They were primary tested after retrofit, and I don't want to risk damage to the contacts because we don't have many spares, and new contacts are becoming hard to find and GEXPRO has very long lead times. I believe the secondary testing will satisfy the requirements without the risk of damage.
Should we use primary or secondary injection for the tests. I don't think primary is a good option. They were primary tested after retrofit, and I don't want to risk damage to the contacts because we don't have many spares, and new contacts are becoming hard to find and GEXPRO has very long lead times. I believe the secondary testing will satisfy the requirements without the risk of damage.