I am working on a bridge project which is undergoing construction. It is a three span bridge . The longest being 25 metres simply supported. This longest span is to be supported on piers (bolted on the sides of the piers) founded on a pad footing at one end and the other on bored piles.The bridge is inclined at 25 degrees. The pad footing being at the top end.The bridge is to support traffic loading for maintenance of a reservoir.
The bridge consists of 5 units of 914 x 350x38 UB.
10 M25 bolts with 12mm ms plates are used for the side connections.
Can Carl , dik and others comment on the design ? Is it workable? Please suggest any recommendations? Thanks
The bridge consists of 5 units of 914 x 350x38 UB.
10 M25 bolts with 12mm ms plates are used for the side connections.
Can Carl , dik and others comment on the design ? Is it workable? Please suggest any recommendations? Thanks