tryeasy
Materials
- Dec 8, 2008
- 3
Dear members,
One tie bar of the 500 Ton die cast machine broke. The DC machine has four tie bars.
The fracture shows as initial fracture (+/-1.5" deep) as fatigue crack then continue the fast catastrophic fracture. See attached pictures. Dimensions of the tie bar: 136” length and 5.25” diameter.
Can the other three tie bars break any time?
Can the shaft be welded?
Does the broken shaft need additional test to determine presence of fatigue crack before weld?
Can penetrant test, magnetic particles or other test detect fatigue cracks?
Thank you for your time and cooperation.
One tie bar of the 500 Ton die cast machine broke. The DC machine has four tie bars.
The fracture shows as initial fracture (+/-1.5" deep) as fatigue crack then continue the fast catastrophic fracture. See attached pictures. Dimensions of the tie bar: 136” length and 5.25” diameter.
Can the other three tie bars break any time?
Can the shaft be welded?
Does the broken shaft need additional test to determine presence of fatigue crack before weld?
Can penetrant test, magnetic particles or other test detect fatigue cracks?
Thank you for your time and cooperation.