I've recently been asked to review structural plans from the 1980s where they plan to start building on abandoned foundations constructed in the 1980s. Does anyone know if this can been done? I can't think of too many major problems, just the minor problems of the condition of the existing foundations.
If the foundation is a post tension slab, I'm concerned about the foundation not being loaded by the actual design loads to resist edge lift. The same if drilled piers, not being loaded to resist uplift soil pressures.
Any advise would be GREATLY appreciated.
If the foundation is a post tension slab, I'm concerned about the foundation not being loaded by the actual design loads to resist edge lift. The same if drilled piers, not being loaded to resist uplift soil pressures.
Any advise would be GREATLY appreciated.