mirhosseini
Industrial
- Dec 4, 2003
- 20
I have a question about Buildup.
I have a WPS for buildup a clad material(In this WPS first the base metal grind down to clad material and then the filler metal is deposited.) and I want to support my WPS with a PQR.
Please tell me about the test coupon that we shall prepare for this PQR.
which tests shall be done on this test coupon?
Regards
H.Mirhosseini
I have a WPS for buildup a clad material(In this WPS first the base metal grind down to clad material and then the filler metal is deposited.) and I want to support my WPS with a PQR.
Please tell me about the test coupon that we shall prepare for this PQR.
which tests shall be done on this test coupon?
Regards
H.Mirhosseini