Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Built-Up Shape - Weld or Bolt 1

Status
Not open for further replies.

RaptorEIT

Structural
Feb 7, 2019
34
I have a continuous W12x53 steel beam that spans 50' over four supports. The steel beam will have a steel C12x20.7 channel placed on top of it to create a "track" to move a load out of a building. See the attached sketch.

I have sized the beam to handle the entire load without considering the channel being there. The channel is only there to prevent the load from rolling off the side of the beam. My question is whether to weld or bolt the channel to the beam. I followed Blodgett's method of sizing stitch welds for built up plate girders to size the stitch welds between the channel and the beam. However, since the channel isn't needed to contribute to the strength of the beam, I am wondering whether this is really necessary or overkill. I calculated that I need 50% of weld area, which yields 25' of weld on each side!

I'm thinking it best instead to bolt the channel to the beam at each end of the track. I'm worried that the beam will break the bolts as it deflects and prys at the bolts, though. Anyone have thoughts or recommendations on this?

Thank you.
 
 https://files.engineering.com/getfile.aspx?folder=4cd6f6fb-3a74-4112-981d-8f9770c09c08&file=Built-Shape.docx
Replies continue below

Recommended for you

I think I follow. My mistake is that I had analyzed the continuous beam separately from the frame, and then used the vertical reactions of the continuous beam at each support to size the column while assuming each cap-plate connection to be of the pin-type. I then used the shear and moment within the continuous beam at each support connection to analyze the welds and bolts for the connection. Instead, I should look at the problem as a fixed frame, with moment transfer between the beam and each column. The stiffness of each column and beam will come into play when analyzing that way, and there should be a much lower moment at each connection to design for.

Thank you for clearing that up for me.

I decided to place 1/2" stiffeners in the beam at each column location, place 1/2" end plates at each end of the beam, and lessen the amount of weld between the channel and beam.
 
Yup, that sounds about right.

When I get to 1000 stars, I get to meet BAretired for lunch. Current start count = 790. Just sayin'...
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor