bujaman
Civil/Environmental
- Sep 10, 2013
- 5
I am fairly new to foundation design and have a question about where to start. I received a soils report from the client and need some help interpreting it. The number of STP blows goes from 16 at 9m depth to 27 at 10.5m, and then to 50 at 12m. If I am reading this correctly, this is where my foundation needs to be in order for there to be stability. Like I said, I am new at this, so any help interpreting this would be appreciated. I have attached the soils report as reference. Thanks in advance.