I'm starting a new mill and overlay project, and I've never calculated the yield of hot mix per truckload, if anybody has experience with this, please let me know how its done. I think it has to do with Lbs. per sq. yd. per inch times length of paving per truckload, meaning a truckload of hot mix has to be able to go so far?