mikeh
Structural
- Feb 29, 2000
- 13
We are currently looking at doing a substaintial amount (8000m^3)of concrete work in an underdeveloped country. As such we must bring with us everything that we we need to produce, transport and place concrete.<br><br>We are currently exploring two options.<br><br>1) Set up a traditional batch plant on site, using ready mix trucks for transport.<br><br>2) Use a self contained, truck mounted, mobile batch plant. i.e. this unit carries water, cement, aggregate and uses a converyor belt and auger sytem to move, mix and place concrete.<br><br>With option #1 we know what we are getting into with respect to producing consistent quality concrete. <br><br>I feel there a quality control issues with Option #2. Can anyone provide some insight into quality control issues using this type of "mix-it-as-you need-it" type mobile batch plant? What adjustments need to be made to our quality control/assurance program do we need to make if we use the truck mounted plant?