Kom3
Structural
- Nov 20, 2019
- 37
Hello all,
I designed a drilled pier that is 5' deep with 6" above ground. Upon doing a structural observation, it is found that the contractor used a sonotube for the full length of the drilled pier (from bottom of embedment to top). It is my view that the sonotube can rot since it is made of cardboard and a half inch perimeter gap can form once it rots. Is leaving the sonotube in the ground an issue? Is there any issues from a constructability point of view if they remove the sonotube before they backfill and compact the surrounding soil?
Regards,
I designed a drilled pier that is 5' deep with 6" above ground. Upon doing a structural observation, it is found that the contractor used a sonotube for the full length of the drilled pier (from bottom of embedment to top). It is my view that the sonotube can rot since it is made of cardboard and a half inch perimeter gap can form once it rots. Is leaving the sonotube in the ground an issue? Is there any issues from a constructability point of view if they remove the sonotube before they backfill and compact the surrounding soil?
Regards,