Jazzy47
Structural
- Feb 22, 2013
- 26
Hello,
I am a structural EIT and am used to seeing cantilevers that attach to the side of the column etc., so it is just necessary to find the end reactions. Well, now I have a cantilever w beam which sits on top of a pipe, and I need to find whether the weld from the beam to the pile cap is sufficient. Is this more of a bearing stress problem? I attached a very very rough sketch. The pipe is 28" OD X 0.465" WT, the beam is a W24X104, the stiffeners are 3/8" plates and the cap plate is 1" thick and 20" diameter. Thank you.
I am a structural EIT and am used to seeing cantilevers that attach to the side of the column etc., so it is just necessary to find the end reactions. Well, now I have a cantilever w beam which sits on top of a pipe, and I need to find whether the weld from the beam to the pile cap is sufficient. Is this more of a bearing stress problem? I attached a very very rough sketch. The pipe is 28" OD X 0.465" WT, the beam is a W24X104, the stiffeners are 3/8" plates and the cap plate is 1" thick and 20" diameter. Thank you.