I have a question regarding the “R” value for cantilever column systems in ASCE7-05 (well, several, actually). Section G of the table gives values for seven different types of systems.
The way it is phrased is this: “Cantilevered column systems detailed to conform to the requirements for:” Then lists:
1. Special steel moment frames
2. Intermediate steel moment frames
Etc.
How does a cantilever column conform to details for a special moment frame? By definition, it does not take moment at the top; therefore, the FEMA 350 / AISC requirements are not applicable. Do you just check the column size restrictions? If so, what about tube steel / HSS type columns?
What is the difference in detailing requirements between SMF and OMF with respect to steel cantilever columns?
What is a “timber frame” and how do I ensure detailing conformance?
Since the base plate is the only connection to take moment, perhaps that is what should be detailing according to moment frame requirements. What is the difference between, say, a SMF base plate and an OMF base plate?
Basically, if a plan checker asked me why I chose a particular r value, how can I justify that decision?
-AC
The way it is phrased is this: “Cantilevered column systems detailed to conform to the requirements for:” Then lists:
1. Special steel moment frames
2. Intermediate steel moment frames
Etc.
How does a cantilever column conform to details for a special moment frame? By definition, it does not take moment at the top; therefore, the FEMA 350 / AISC requirements are not applicable. Do you just check the column size restrictions? If so, what about tube steel / HSS type columns?
What is the difference in detailing requirements between SMF and OMF with respect to steel cantilever columns?
What is a “timber frame” and how do I ensure detailing conformance?
Since the base plate is the only connection to take moment, perhaps that is what should be detailing according to moment frame requirements. What is the difference between, say, a SMF base plate and an OMF base plate?
Basically, if a plan checker asked me why I chose a particular r value, how can I justify that decision?
-AC