Hi guys, haven't touched earth retention in a while and would appreciate if the experts could give me some quick feedback on my methods.
Ended up with a total depth of embedment of 4.5m below excavation level. 600 DIA piles @ 1500 c/c with 150thk shotcrete lagging.