smurali1
Automotive
- Apr 21, 2003
- 40
Are there any correction factor for calculating capability when samples sizes are low?
Here I am talking about 10~12 samples. The industry I am operating produces parts at a rate of 10~12 per month. So, waiting for 30 parts is taking too long a time to assess capability.
Thanks
SPM
Here I am talking about 10~12 samples. The industry I am operating produces parts at a rate of 10~12 per month. So, waiting for 30 parts is taking too long a time to assess capability.
Thanks
SPM