Parrapit
Structural
- Dec 6, 2012
- 31
Hey Guys
I need to design or check a connection of a steel post 100 X 100 X 2MM square tube that is cast in the concrete footing.
The post at the bottom has 2 steel re-bar drilled through the post and horizontally imbedded into the concrete. There is a big uplift force of around 30 KN.
So the part that needs attention would be min thick of concrete needed not to counter weight, the up lift force, have done that all ready, but for the punching shear or pull out force. As well as the actual bonding between the bars, post and concrete.
Normally you would have a base plate so that’s easy but how do you determine the (pull out) strength of a horizontal rebar holding the post.
Also probably have to check the shear on the post so the rebar does not tear out the post.
Concrete strenght of 25Mpa Rebar around Y12.
Any suggestions
I need to design or check a connection of a steel post 100 X 100 X 2MM square tube that is cast in the concrete footing.
The post at the bottom has 2 steel re-bar drilled through the post and horizontally imbedded into the concrete. There is a big uplift force of around 30 KN.
So the part that needs attention would be min thick of concrete needed not to counter weight, the up lift force, have done that all ready, but for the punching shear or pull out force. As well as the actual bonding between the bars, post and concrete.
Normally you would have a base plate so that’s easy but how do you determine the (pull out) strength of a horizontal rebar holding the post.
Also probably have to check the shear on the post so the rebar does not tear out the post.
Concrete strenght of 25Mpa Rebar around Y12.
Any suggestions