Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

Cement-Bentonite Slurry

Status
Not open for further replies.

ONENGINEER

Geotechnical
Oct 13, 2011
282
0
0
CA
Has anybody experience placing CB slurries underwater using a tremie method. I have experience tremie concreting of large steel pipe piles, placing structural concrete but not CB Slurry. I am interested to know if CB slurries could be placed by a tremie in 10 m deep casings (1 m dia)that contain about 5 m of groundwater. My question stems from ather low density of CB slurries if they could provide a front to push water upwards without mixing with water. Thank you in advance.
 
Replies continue below

Recommended for you

It has already been done, in my case replace bentonite slurry by BC slurry in a slurry wall 50 deep and 1 m wide. You must be sure that your CB slurry is stable which means good hydratation of mother bentonite slurry and enough cement ( around 180 to 200 kg per m3).Obviously you will get, just like with concrete, some "bad" CB slurry/water mix on top.
 
Status
Not open for further replies.
Back
Top