I got handed what should have been a cut and dry duplex lift station (4 HP pumps), however it does not work. There is about 5' of head I can not account for in the 4" forcemain.
In my calculation I used a friction loss co-efficient of 2 or 3 (notes are at the office) for a 4" swing check valve (Americal Flow Control was installed). Is this enough? I have not been able to locate a flow vs. loss diagram yet.
The station is pumping from 56 to 75 gpm depending on WW water level. I was wondering if this was enough to even open a 4" CV all the way, which I would think would add more friction loss to the system?
If I can be satisfied there isnt more loss in the CV than I am accounting for, my next guess is a local high point with a bit of air causing the losses.
Thanks,
Mike
In my calculation I used a friction loss co-efficient of 2 or 3 (notes are at the office) for a 4" swing check valve (Americal Flow Control was installed). Is this enough? I have not been able to locate a flow vs. loss diagram yet.
The station is pumping from 56 to 75 gpm depending on WW water level. I was wondering if this was enough to even open a 4" CV all the way, which I would think would add more friction loss to the system?
If I can be satisfied there isnt more loss in the CV than I am accounting for, my next guess is a local high point with a bit of air causing the losses.
Thanks,
Mike