hi all,
kindly need your advise about this,
i involved in superblock project (apartment and hotel 26 storey), soil profiles accross site describe as below (average soil boring consistent) :
0-1.5 m : clay (N-SPT 60 = 5)
1.5 - 40 m : sand (N-SPT > 60)
our geotechnical team have been choosing to use driven square piles. with different pile penetration for each areas and now this project already on going.
but we have problem with pile penetration, several piles can't penetrate below Cut of Level.
M.A.
kindly need your advise about this,
i involved in superblock project (apartment and hotel 26 storey), soil profiles accross site describe as below (average soil boring consistent) :
0-1.5 m : clay (N-SPT 60 = 5)
1.5 - 40 m : sand (N-SPT > 60)
our geotechnical team have been choosing to use driven square piles. with different pile penetration for each areas and now this project already on going.
but we have problem with pile penetration, several piles can't penetrate below Cut of Level.
M.A.