I`m currently designing abridge with the following data
spans respectively 55,70,100,70,55 meters
width 13 meter
cross section post tension box with 3 webs
any advice about the books i need to read to choose the right construction sequence and the system supports (piers)
spans respectively 55,70,100,70,55 meters
width 13 meter
cross section post tension box with 3 webs