BSVBD
Structural
- Jul 23, 2015
- 463
In AISC it appears as though the only way to accomplish a CJP / Full-Pen weld is either to weld from both sides or apply a backing (backer?) bar.
In a case where I might specify a Partial-Joint Penetration weld for up to 1/4" material, butt (or square) to 5/16" or thicker, will my "partial" actually produce a "full-pen"?
I have a case where the general contractor frequently repairs PEMB columns after tow-motors (or other) collide with the columns to the extent that necessitates removal of the lower 8' of 0.188" wall intermediate column, and (the G.C. is) replacing it with 0.322" Schedule 40. Therefore, since I'm welding 0.188" Round HSS to Schedule 40 Pipe, I can neither weld from both sides nor install backing.
Again... will my "partial" actually produce a "full-pen"?
I frequently specify a "full-pen" weld, all around weld for HSS Rectangulars when designing stair stringers composed of adjoining, diagonal and horizontal members. Is this wrong?
I realize I need more education in welding.
Thank you!
In a case where I might specify a Partial-Joint Penetration weld for up to 1/4" material, butt (or square) to 5/16" or thicker, will my "partial" actually produce a "full-pen"?
I have a case where the general contractor frequently repairs PEMB columns after tow-motors (or other) collide with the columns to the extent that necessitates removal of the lower 8' of 0.188" wall intermediate column, and (the G.C. is) replacing it with 0.322" Schedule 40. Therefore, since I'm welding 0.188" Round HSS to Schedule 40 Pipe, I can neither weld from both sides nor install backing.
Again... will my "partial" actually produce a "full-pen"?
I frequently specify a "full-pen" weld, all around weld for HSS Rectangulars when designing stair stringers composed of adjoining, diagonal and horizontal members. Is this wrong?
I realize I need more education in welding.
Thank you!