waltalltype
Electrical
- Jan 22, 2004
- 4
I have just recieved a call from a hospital maintenance man.He says that when they start their onsite generator.The entire radiology department goes down, and when they bring the power back up their wall clock runs backwards. To fix the clock they unplug it and then plug it back in. Any idea's. THANKS